- Model NO.:
- Yast-JD250
- Certification:
The Flow Chart:
The Detail of Machine:
Adoptoriginal Switzerland automatic gluing gunjet, outstanding for no interruption no matter for low speed, middle speed or high speed. It is very easy to adjust the glue output flow, it performance quite steadily. Thanks for the gunjet, there is no need to adjust the output glue flow and assemble high heat protector, it is safe to the operator.
Piercing station of bag making machine
The paper tube forming adopts an integrated tube forming adjustment structure, which can be adjusted in one or two directions. The adjustment is simple, convenient, fast, and stable.
The cutting adopts a high-speed uniform rotating cutter to cut through a serrated knife or a flat knife. The appearance of the paper bag cut is smooth and beautiful.
Color code tracking: Adopting German SICK color code photoelectric tracking, accurate tracking of paper bag printing patterns, automatic color code registration, no need to re-adjust the cutting position when changing paper rolls or power failure, automatic shutdown of color code errors, reducing scrap rate .
Available Italy SELECTRA Material edge rectify system, substantially cut off the edge alignment time
Company Workshop:
Packaging & Shipping:
FAQ:
Q:What types of machines in your manufactory?
A:Commonly are paper bag making machine( sharp bottomand square bottom), printing machine,non-woven bag making machine.
Q:How about your after-sales service?
A:The machine will have a 1-year warranty for the machine,2 years warranty for the electric part. During the warranty year if any of the parts broken not by man-made.(Wear parts excepted.We 'll send you a wearing parts list).We will free charge to replace the new one for you. The warranty will begin after the machine send out we received the B/L.
Q:How long is your delivery time?
A:about60working days after receiving the deposit. The factory will decide whether to change the delivery date when the order is /confirm/ied.
Q:What are the payment terms of your manufactory?
A:After signing of the contract ,the total amount of 30% advance payment, factory acceptance payment before delivery after the machine testing is ok.