Feature of horizontal autoclave sterilizer:
1. Sterilizing course automatic sterilization controlled,easy to operate.
2. With drying function,suitable dressing drying.
3. With over-temperature,over-pressure auto-protect device.
4. The door opening mechanism cannot be operated until the pressure in the chamber is reduced to 0.027MPa.It can't be start on if the door doesn't close well.
5.The safety value will be open automatically when the inner pressure over 0.24MPa,and the steam be exhausting to the water tank.
6. The power will be cut-off automatically,cut-off the water and alarm when the machine lacking water.
7. The chamber of the sterilizer is made of stainless steel.
Specification of horizontal autoclave sterilizer:
Sterilizing chamber volume: 150L (φ440*1100mm), 200L (φ515*1000mm), 280L (φ600*1000mm), 400L (φ700*1100mm), 500L (φ700*1300mm)
Working pressure: 0.22MPa
Working temperature: 134ºC
Adjustment of temperature: 105ºC-134ºC
Time of sterilization: 0-60 min
Time of drying: 0-60 min
Heat average:≤± 1ºC
Power: 220V 50Hz
Dimension: 1400*600*1300mm, 1400*670*1650mm, 1400*700*1780mm, 1430*880*1830mm, 1800*900*1820mm
Transport Dimension: 1550*750*1850mm, 1560*820*1850mm, 1680*920*2100mm, 1800*1050*2100mm, 1850*1050*2100mm
G.W./N.W.: 320/240KG, 350/260KG, 465/365KG, 530/520KG, 580/470KG
Picture of horizontal autoclave sterilizer:
Other related products/Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.